BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated July 29, 2026

Demolition, site work, paving and renovation of a sidewalk / parking lot in Glen Carbon, Illinois. Completed plans call for the demolition of a sidewalk / parking lot; for the renovation of a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

Somerset Sidewalk Repairs - Removal and replacement of sidewalk panels in the Somerset Subdivision. The selected contractor will ensure that the sidewalks are removed with minimal damage to surrounding property and that replaced panels meet ADA guidelines. The successful proposer shall furnish all labor, equipment, tools, parts, and materials required to perform the following services. All work must be completed prior to December 1 , 2026. Sidewalk Removal and Replacement All JULIE requirements shall be met prior to removal of sidewalk. Construction shall follow Section 424 of the Standard Specifications for Road and Bridge Construction. Sidewalk shall be removed with minimal damage to surrounding turf and adjacent infrastructure. Concrete saw shall be used to cut the concrete at the nearest joint. Sidewalk shall be broken into manageable pieces and disposed of by the bidder. Excavated area shall be protected with orange construction fencing until sidewalk has cured and is ready to be opened to the public for use. Subgrade shall be removed to allow for 4" of subgrade granular material to be placed and compacted below the new sidewalk panel. Subgrade granular material shall be compacted tightly with a plate compactor. Sidewalk panels shall be formed using wood or metal forms. Forms shall be set to ensure sidewalk meets ADA compliance. Joint spacing should match existing conditions. Portland cement concrete shall be used for the sidewalk with a maximum slump of 4". Concrete shall be leveled and smoothed with a light broom finish applied to the surface. Any new concrete panel placed by the bidder that exceeds 2.0% cross slope will be removed and replaced by the bidder at his/her expense. If existing panel exceeds 2.0%, contractor will match existing slopes over a 2' transition length. Concrete poured after November 1 shall have protective coat applied per IDOT specifications For any questions regarding this RFB, please contact : Scott Slemer, P.E. - Director of Public Works Email: saslemer@glencarbonil.gov Locations- 113 Somerset 4'x22' 88 SF 116 Somerset 4'x12' 48 SF 128 Somerset 4'x19' 76 SF 136 Somerset 4'x6' 24 SF 141 Somerset 4'x5' 20 SF 148 Somerset 4'x10' 40 SF 10 Bristol Ct 4'x18' 72 SF 164 Somerset 4'x12' 48 SF 172 Somerset 4'x24' 96 SF 181 Somerset 4'x13' 52 SF 184 Somerset 4'x9' 36 SF 23 Rose Ct 4'x8' 32 SF 19 Rose Ct 4'x14' 56 SF 15 Rose Ct 4'x15' 60 SF 9 Rose Ct 4'x5' 20 SF 5 Rose Ct 4'x18' 72 SF 22 Rose Ct 4'x8' 32 SF 26 Rose Ct 4'x12' 48 SF 30 Rose Ct 4'x8' 32 SF 27 Rose Ct 4'x20' 80 SF 34 Rose Ct 4'x28' 112 SF 207 Somerset 4'x8' 32 SF 212 Somerset 4'x8' 32 SF 2801 Bristol Way ADA Ramp 25 SF 2808 Bristol Way 4'x6' 24 SF 2812 Bristol Way 4'x5' 20 SF 2816 Bristol Way 4'x5' 20 SF 2819 Bristol Way 4'x12' 48 SF 2901 Bristol Way 4'x8' 32 SF 115 Walden 4'x10' 40 SF 119 Walden 4'x16' 64 SF 123 Walden 4'x11' 44 SF 127 Walden (Inc Apron) 4'x20' 80 SF 136 Walden 4'x7' 28 SF 140 Walden (inc Apron) 4'x14' 56 SF 116 Windover 4'x8' 32 SF

Sub-Bidding

$25,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
99
Bidding Soon
1,532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2026

September 3, 2026

Project location map

Multiple Locations, Glen Carbon, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.