BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 27, 2026 at 8:00 PM

Updated September 2, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in West Hempfield Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

This Project Consists of a Bridge Preservation to the Sr 3036, Section 005 (Franklin Road) Bridge Over Strickler Run, Bridge Rehabilitation to the Sr 4008-034 (Elizabethtown Road) Bridge Over Brubaker Run, and a Bridge Replacement of the Sr 4033, Section 008 (Milton Grove Road) Bridge Over Back Run and Other Miscellaneous Construction, All as Indicated on the Approved Drawings Included in the Bid Package for State Route 3036, Section 005, in Lancaster County, West Hempfield Township, From Segment 0030 Offset 0737 to Segment 0030 Offset 1276, for a Length of 339.00 Linear Feet (0.064 Mile), and for State Route 4008, Section 034, in Lancaster County, Rapho Township, From Segment 0290 Offset 0158 to Segment 0290 Offset 0858, for a Length of 500.00 Linear Feet (0.095 Mile), and for State Route 4033, Section 008, in Lancaster County, Rapho Township, From Segment 0030 Offset 1421 to Segment 0040 Offset 0300, for a Length of 690.00 Linear Feet (0.131 Mile). Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 53.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - Franklin Road Over Strickler Run *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$5,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
737
Active Projects
302
Bidding Soon
4,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

November 2, 2026

Project location map

Franklin Rd, West Hempfield Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.