BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 27, 2026

This is a service / maintenance or supply contract in Peosta, Iowa. Contact the soliciting agency for additional information.

Tree Planting Site Preparation, Tree Planting, and Herbicide Application Project Dates : Aug 14th, 2026 - June 30th, 2027 Subrecipient shall hire a contractor to complete the following in "Project Area" from the accompanying Forest Project Plan for the Miller-Mcgrath Area property in Dubuque County. Contractor shall prepare the area for tree planting by brush mowing the full area in August. Avoid pockets of existing desirable species, including wild plum and walnut, where possible. Contractor shall broadcast apply glyphosate to the complete mowed area once grasses have grown to around 4-6" in height following mowing. Chemicals used in performing these practices shall be applied according to authorized use, labeled direction, and other federal or state policies and requirements. Applicator shall hold an Iowa Commercial Pesticide Applicators License issued by the Iowa Department of Agriculture and Land Stewardship (IDALS) Pesticide Bureau and provide license # to the DNR Project Manager unless a non-restricted herbicide is being used and has been approved by the DNR Project Manager. Contractor must plant "Project Area" with 300 seedlings/acre for a total of 1200 seedlings evenly throughout the stand using an approximate spacing of 12'x12' where possible. Avoid existing plum thickets and dense walnut stands. Seedlings must be 3-0 age class, if available. If unavailable, the next largest size class must be used. Follow the species list and quantity in the accompanying plan. Substitutions must be preapproved by the DNR District Forester. Contractor must plant the seedlings within one week of their arrival. If seedlings cannot be planted within one week of their arrival, the contractor must keep them in cold storage at 35-40 degrees Fahrenheit. All seedlings must be planted at the same depth as they were grown in the nursery or slightly below with no exposed roots. Seedlings must be properly tamped in to eliminate air pockets and should not pull out with a slight tug. Seedlings must be vertically planted and do not lean by an angle more than 20 degrees. For best success of the trees, it is recommended to install 400 five-foot-tall, vented tree tubes (ex. TreePro brand) and fiberglass stakes per acre. Stakes could include commercially available stakes (ex: Plantra brand) or fiberglass rebar. These should be installed on a mix of oak species. After all the seedlings are planted and before any vegetation emerges, Contractor must spray directly over top of seedlings with Pendulum and Princep herbicide. Contractor must apply 2 quarts per acre of Pendulum. Contractor must apply 3 quarts per acre of Princep. Chemicals used in performing these practices shall be applied according to authorized use, labeled direction, and other federal or state policies and requirements.

Sub-Bidding

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
62
Bidding Soon
1,214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2026

August 14, 2026

Project location map

Multiple Locations, Peosta, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.