BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 29, 2026

Site work and paving for a mixed-use development in Pismo Beach, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Removal of existing blufftop sidewalk and installation of new DG pathway and site improvements. Question Deadline 08/14/2026 at 5:00 PM PT Online Q&A Yes o Pre-Bid Job Walk Meeting will be held LOCATION AND SCOPE OF WORK The work to be performed consists of the CONTRACTOR furnishing all materials, equipment, tools, labor, and incidentals necessary for the construction of the proposed project, complete in place in accordance with the contract drawings and specifications and subject to the terms and conditions of the Agreement. The work to be performed includes, but is not limited to furnishing all materials, equipment, tools, labor, and incidentals as required by the plans, specifications, and contract documents for concrete sidewalk removal and installation of ADA complaint decomposed granite pathway improvements at Eldwayen Ocean Park in the City of Pismo Beach. See project plans and details for more detailed description of the location. The work includes: Saw-cutting; removal and disposal of the portland cement concrete (PCC) pathway; installation of decomposed granite pathway; removal and relocation of chain barrier and wood posts; removal and relocation of park benches, tables and barbeques grill; installation of new ADA compliant picnic table and grill ; installation of new park benches; minor surface leveling; hydroseed application; and clean-up of the project area.

GC Bidding

$82,408.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
32
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 21, 2026

Project location map

Multiple Locations, Pismo Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.