Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 30, 2026 at 8:00 PM

Updated October 9, 2026

Renovation of a water / sewer project in Clearwater, Florida. Completed plans call for the renovation of a water / sewer project.

Repair of the influent building floor at the NE Water Reclamation Facility. Question Deadline 08/12/2026 at 5:00 PM ET All questions as to the meaning or intent of the Contract Documents are to be directed in writing to the Engineer Construction Time 365 days The scope of work for the replacement of the grating at the influent building through the splitter box includes in general the following: 1 . Demolition of the existing grating over the channels in the influent headworks building and through to the splitter box; 2. Installation of new grating over the channels in the influent headworks The Contractor shall obtain from the Owner all water required for the work. The Contractor shall pay the Owner for all water used during construction for the work. Contractor shall provide Engineer a minimum of 14-calendar days advance written notice of any requested change in utilities operations, bypass requirements or connections to existing facilities, and shall obtain the Engineer's written approval before scheduling this work. No overtime costs shall be incurred by the Owner due to scheduled nighttime construction activities. The Contractor shall incorporate these activities into its normal operating schedule.

Award

$375,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
104
Bidding Soon
1,702
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

March 4, 2027

Project location map

To Be Determined, Clearwater, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed