Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 23, 2026 at 8:00 PM
Updated July 28, 2026
Remodeling of a military facility in Centennial, Colorado. Completed plans call for the remodel of a military facility.
The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information. The Department of Military and Veterans Affairs (DMVA) is soliciting bids from qualified contractors for the J9 Suite Remodel project at the Joint Force Headquarters (JFHQ), 2-Story Building, 6848 S Revere Parkway, Centennial CO 80112. The J9 Directorate was established in 2022 and is the one stop for Colorado National Guard (CONG) members and their families to access prevention, response, and readiness services. The J9 suite (3,900 SF) is located on the north side of the first floor of the 2-Story Building and consists of 10 offices, 18 cubicles and 1 conference room. The construction project aims to refresh the look of the suite by replacing the carpet and cubicles, enlarging the entrance and constructing new walls to enclose a new 250 SF breakroom area within the existing open office. Electrical and mechanical work are included to ensure new cubicles are powered and supply adequate air flow to the breakroom. (Please note that the new carpet, baseboard and loose furniture including cubicles are purchased by the Owner.) Contractors shall include all labor, materials, equipment, and coordination necessary for full implementation. The scope includes the renovation of the J9 suite in the 2-Story Building in compliance with ADA Standards for accessible Design 2024 International Building Code (IBC) and 2017 International Code Council (ICC) Accessibility Guidelines Design & Planning o Obtain all necessary permits and approvals from regulatory agencies. Demolition & Site Preparation o Demolish parts of walls to achieve the new layout. o Ensure all electrical and mechanical systems are assessed before construction begins. o Owner will remove existing cubicles and loose furniture in the open work area before construction begins. Construction & Installation o Construct new walls with electrical outlets. o Move the existing entrance door out to create a larger entry space. o Provide power to new cubicles and other furniture (cubicles and furniture are purchased by Owner.) o Provide conduits and wall boxes only for data (data wires are provided and installed by Owner's supplier.) o Provide adequate air flow to the newly enclosed breakroom. There will be three alternates included in this project: o Alternate #1 involves removing the existing carpet tiles and rubber base in the Open Office and installing new carpet tiles and rubber base purchased by Owner. o Alternate #2 involves removing the existing carpet tiles and rubber base inside the enclosed offices and conference room and installing new carpet tiles and rubber base purchased by Owner. o Alternate #3 involves painting existing walls inside the Open Office (the painting of new walls is included in the Base Bid.) Request for Clarifications Due July 14, 2026 at 10:00 AM Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule to kimberlie.smith@dmva.state.co.us. Anticipated Construction Start August 2026 Anticipated Construction Finish September 2026
Post-Bid
$78,000.00
Public - State/Provincial
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2026
August 3, 2026
6848 S Revere Pkwy, Centennial, CO
Related To This Project
Centennial, CO
Bid Date: Jul 28 2026
Centennial, CO
Bid Date: Jul 29 2026
Centennial, CO
--
Centennial, CO
Bid Date: Aug 11 2026
Centennial, CO
Bid Date: Aug 05 2026
Centennial, CO
--
Centennial, CO
--
Centennial, CO
Bid Date: Jul 10 2026
Centennial, CO
--
Centennial, CO
--
Centennial, CO
--
Centennial, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
