Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 23, 2026 at 8:00 PM
Updated July 27, 2026
Remodeling of a military facility in Centennial, Colorado. Completed plans call for the remodel of a military facility.
The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information. The State of Colorado, Department of Military and Veterans Affairs, is soliciting bids from qualified contractors for the JFHQ Controlled Space Remodel. The Colorado Army National Guard (COARNG) project is located at 6848 S Revere Pkwy Centennial, Colorado 80112. This space is approximately 338 SF. This project will remodel the existing controlled space to current standards to better support mission requirements. The project will include changes to vestibule configuration, rerouting of existing MEP, installation of new water source heat pump and door and wall type upgrades. The selected contractor will need to check in and check out with gate and building leadership. The Joint Force HQ building will remain in operation during construction and work to be conducted Tuesday through Friday 6:30AM to 5:00PM. Weekends, as needed with prior approval, to meet target completion date. The owner will be providing third-party code inspection services. The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project. Request for Clarifications Due July 17, 2026 at 2:00 PM Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule to Kimberlie.smith@dmva.state.co.us Anticipated Construction Start August 2026 Anticipated Construction Finish November 2026
GC Bidding
$550,000.00
Public - State/Provincial
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2026
August 3, 2026
6848 S Revere Pkwy, Centennial, CO
Related To This Project
Centennial, CO
Bid Date: Jul 29 2026
Centennial, CO
Bid Date: Jul 23 2026
Centennial, CO
--
Centennial, CO
Bid Date: Aug 11 2026
Centennial, CO
Bid Date: Aug 05 2026
Centennial, CO
--
Centennial, CO
--
Centennial, CO
Bid Date: Jul 10 2026
Centennial, CO
--
Centennial, CO
--
Centennial, CO
--
Centennial, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
