BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 23, 2026 at 8:00 PM

Updated July 27, 2026

Remodeling of a military facility in Centennial, Colorado. Completed plans call for the remodel of a military facility.

The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information. The State of Colorado, Department of Military and Veterans Affairs, is soliciting bids from qualified contractors for the JFHQ Controlled Space Remodel. The Colorado Army National Guard (COARNG) project is located at 6848 S Revere Pkwy Centennial, Colorado 80112. This space is approximately 338 SF. This project will remodel the existing controlled space to current standards to better support mission requirements. The project will include changes to vestibule configuration, rerouting of existing MEP, installation of new water source heat pump and door and wall type upgrades. The selected contractor will need to check in and check out with gate and building leadership. The Joint Force HQ building will remain in operation during construction and work to be conducted Tuesday through Friday 6:30AM to 5:00PM. Weekends, as needed with prior approval, to meet target completion date. The owner will be providing third-party code inspection services. The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project. Request for Clarifications Due July 17, 2026 at 2:00 PM Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule to Kimberlie.smith@dmva.state.co.us Anticipated Construction Start August 2026 Anticipated Construction Finish November 2026

GC Bidding

$550,000.00

Public - State/Provincial

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
76
Bidding Soon
1,689
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.