BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 5, 2026

Site work for a water / sewer project in Calabasas, California. Completed plans call for site work for a water / sewer project.

The scope of this project is to remove and replace the aeration system at Calabasas Lake, located in the Calabasas Park Homeowners Association in the City of Calabasas. The bid must be accompanied by a bid guarantee in the amount of 10% of the total bid ON THE DATE ADVERTISED FOR THE OPENING OF BIDS. More specifically, pursuant to Public Contract Code 20170 and 20171, all bids for the project shall be presented, under sealed cover and shall be accompanied by one of the following forms of bidder's security in the amount of ten percent (10%) of the bid: (a) cash; (b) a cashier's check made payable to the City of Calabasas; (c) a certified check made payable to the City of Calabasas; or (d) a bidder's bond executed by an admitted surety insurer, made payable to the City of Calabasas. Such security shall be forfeited should the successful bidder to whom the contract is awarded fails to timely execute the contract and to deliver the necessary bonds and insurance certificates as specified in the contract documents. The AGENCY reserves the right to reject any and all bids. The CONTRACTOR shall begin work within fifteen (15) calendar days after the date of the Notice to Proceed, and shall diligently prosecute said work to completion before the expiration 90 days WORKING DAYS. The CONTRACTOR shall pay to the AGENCY liquidated damages in accordance with Section 6-9 of the special Provisions (Section F) for each calendar day, or portion thereof, of delay in finishing the work in excess of the number of working days prescribed. Question Deadline 08/05/2026 at 2:00 PM PT No oral interpretations will be made to any bidder as to the meaning of the contract documents. Requests for an interpretation shall be made in writing and delivered to the AGENCY at least five (5) working days before the time announced for opening the proposals. Interpretations by the AGENCY will be in the form of addenda to the contract documents and, when issued, will be sent as promptly as is practical to all parties to whom the contract documents have been issued. Bid Results/Contractor Selection:August 17, 2026 Council Approval of Contract:September 9, 2026 New Contract In Effect:September 16, 2026 Construction Start Date, not earlier than:September 28, 2026 Construction End Date, not later than:December 28, 2026 Engineer's Estimate: $325,00

GC Bidding

$325,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
539
Active Projects
182
Bidding Soon
3,222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

September 28, 2026

Project location map

Calabasas Lake, Calabasas, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.