BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated August 4, 2026

Site work and renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a 1,600-square-foot educational facility; and for site work for a educational facility.

Furnishing and installing new booster chiller equipment, pumps, cooling coil, and humidifier dispersion tubes for AHU-3; includes associated mechanical, electrical, controls, and testing work; demolition and replacement of ceiling tiles and grid for conduit routing. The scope of work for this project includes the furnishing and installing of new booster chiller equipment and associated pumps to serve the existing AHU-3 at the Wasserman Building mechanical penthouse. The work also includes replacement of the existing cooling coil and humidifier dispersion tubes serving AHU-3, along with all required mechanical, electrical, controls, support, and testing work needed to place the system into operation. Mechanical scope includes furnishing and installing a new water-cooled chiller, new chilled water pumps, buffer tank, and related piping and accessories required for the new chilled water system. The existing cooling coil and humidifier dispersion tubes serving AHU-3 will be replaced. The project will also include testing and balancing by an independent AABC-certified agent. Electrical scope includes providing a new electrical panel to serve the new equipment as required. The new panel will be fed from an existing switchboard located on the lower level of the building. New electrical conduits and supports will be routed from the lower level up to the penthouse to provide power to the new equipment and associated accessories. Architectural/demo scope includes temporary removal and replacement of existing ceiling tiles and grid as needed to provide new conduits and supports. Existing hard-lid ceiling areas will also be demolished where required to support conduit routing and installation. Since electrical conduits will be routed vertically through the building shaft, the shaft area will be accessed as needed to complete the conduit installation from the lower level to the penthouse. The work area is primarily located on the west side of the roof within the mechanical penthouse, with additional work on the fifth level and lower level as required for conduit routing, electrical connections, and access to existing building infrastructure. Due to the sensitive and occupied nature of the facility, all project work shall be performed during nighttime hours, except for work within the roof penthouse, which may be performed during normal working hours. The estimated construction cost is $600,000.00. additional pre bid meeting note: Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami)

Post-Bid

$600,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
623
Active Projects
270
Bidding Soon
3,804
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2026

August 27, 2026

Project location map

300 Stein Plaza Driveway, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.