BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2026 at 8:00 PM

Updated August 3, 2026

Demolition, site work and renovation of a mixed-use development in Los Angeles, California. Completed plans call for the renovation of a 2,377-square-foot, 10-story above grade educational facility.

Interior renovation and reconfiguration of dental offices, restrooms, corridors, and atrium. Scope includes interior demolition of partitions, ceilings, and flooring; installation of new partitions, ceilings, and flooring; new interior finishes; installation and anchorage of equipment; exterior atrium landscaping upgrades; and modifications to mechanical, electrical, plumbing, lighting, fire sprinkler, and fire alarm systems. The Department of Orthodontics at the School of Dentistry (SOD) proposes to renovate and reconfigure Offices A0-121 , A0-121A, A0-121B, and A2-122; Storage Rooms A0-117B and A2-122A; Restrooms A0-119A, A0-119B, and A0-119C; Vestibule A2-130; Atrium A0-119UE; Corridor A0-119 and a portion of Corridor A0-115, all located on Level A of the SOD building, to meet current operational needs. The renovation area, totaling approximately 2,505 gsf (1,223 asf) , would accommodate a new dental clinic, including a reception area, open clinic space, calming and quiet treatment rooms, a sterilization room, storage, and a mechanical support room for dental equipment. A new all-gender restroom would also be provided. The SOD is a 210, 189 gsf (122,243 asf) eight-story building, plus two basement levels, constructed in 1966. The project scope includes the interior demolition of existing partitions, ceilings, and floorings; installation of new partitions, ceilings, and flooring; new interior finishes; installation and anchorage of equipment; upgrades and modifications to the exterior atrium landscaping; and upgrades and modifications to the mechanical, electrical , plumbing , lighting, fire sprinkler, and fire alarm systems to support the new program. New dental equipment will be furnished by the University and installed by the dental manufacturer's installer.

Post-Bid

$2,394,420.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
229
Bidding Soon
3,713
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2026

September 28, 2026

Project location map

714 Tiverton Ave, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.