Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 29, 2026 at 8:00 PM
Updated August 4, 2026
Site work and renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a 1,600-square-foot educational facility; and for site work for a educational facility.
Furnishing and installing new booster chiller equipment, pumps, cooling coil, and humidifier dispersion tubes for AHU-3; includes associated mechanical, electrical, controls, and testing work; demolition and replacement of ceiling tiles and grid for conduit routing. The scope of work for this project includes the furnishing and installing of new booster chiller equipment and associated pumps to serve the existing AHU-3 at the Wasserman Building mechanical penthouse. The work also includes replacement of the existing cooling coil and humidifier dispersion tubes serving AHU-3, along with all required mechanical, electrical, controls, support, and testing work needed to place the system into operation. Mechanical scope includes furnishing and installing a new water-cooled chiller, new chilled water pumps, buffer tank, and related piping and accessories required for the new chilled water system. The existing cooling coil and humidifier dispersion tubes serving AHU-3 will be replaced. The project will also include testing and balancing by an independent AABC-certified agent. Electrical scope includes providing a new electrical panel to serve the new equipment as required. The new panel will be fed from an existing switchboard located on the lower level of the building. New electrical conduits and supports will be routed from the lower level up to the penthouse to provide power to the new equipment and associated accessories. Architectural/demo scope includes temporary removal and replacement of existing ceiling tiles and grid as needed to provide new conduits and supports. Existing hard-lid ceiling areas will also be demolished where required to support conduit routing and installation. Since electrical conduits will be routed vertically through the building shaft, the shaft area will be accessed as needed to complete the conduit installation from the lower level to the penthouse. The work area is primarily located on the west side of the roof within the mechanical penthouse, with additional work on the fifth level and lower level as required for conduit routing, electrical connections, and access to existing building infrastructure. Due to the sensitive and occupied nature of the facility, all project work shall be performed during nighttime hours, except for work within the roof penthouse, which may be performed during normal working hours. The estimated construction cost is $600,000.00. additional pre bid meeting note: Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami)
Post-Bid
$600,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2026
August 27, 2026
300 Stein Plaza Driveway, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Jul 28 2026
Los Angeles, CA
Bid Date: Aug 06 2026
Los Angeles, CA
Bid Date: Sep 03 2026
Los Angeles, CA
Bid Date: Aug 04 2026
Los Angeles, CA
Bid Date: Aug 26 2026
Los Angeles, CA
Bid Date: Aug 17 2026
Los Angeles, CA
Bid Date: Aug 20 2026
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Aug 05 2026
Los Angeles, CA
Bid Date: Aug 28 2026
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Sep 28 2026
Environmental Compliance Support Services for the Greater Los Angeles VA Healthcare System - 6191431
Los Angeles, CA
Bid Date: Jul 01 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
