BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 3, 2026

Site work and paving for a sidewalk / parking lot in Wenatchee, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Grading for parking lot improvements, construction of curbs, sidewalks, and asphalt pavement, installation of underground utility conduits for electric vehicle chargers, switchboard and panel board installation, and lighting control cabinet preparation. Question Deadline 07/29/2026 Requests for interpretation or explanation shall be provided in writing and addressed to: Donald Nelson P.E. Sr. Project Engineer City of Wenatchee dnelson@wenatcheewa.gov (509) 888-3255 The Engineer's estimated range of probable cost is $530,000 to $590,000. The purpose of this project is to provide improved access to the Pybus South Parking Lot necessary to accommodate Electric Vehicle Chargers (EVC) provided through funding by Washington's Climate Commitment Act and grading the entire site to final subgrade elevations along Worthen Street south of Orondo Street. This construction provides the underground utility preparation for the electric charging units that the city has obtained and for future site development phases. The major items of work include: clearing and grubbing, removal of structures and obstructions, roadway excavation and haul, cement concrete curb, sidewalk, placing and shaping crushed surfacing base; and constructing hot mix asphalt pavement; signing; bollards, pavement marking; and other Work. The Electrical Utility preparation includes installation of Chelan PUD primary electrical line extension installation including two 575 Vaults that are for 480V 3 Phase transformer and placing PUD conduit and the purchasing of 1200A Switchboard compatible with PUD metering and purchasing 600A Panel board cabinet and installing interconnecting conduits with wire and preparing foundations for EVC installed by others. Preparing a 120V lighting control cabinet for future parking lot lighting. All work shall be completed in accordance with the contract plans, special provisions, and the 2026 WSDOT Standard Specifications *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$590,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
22
Bidding Soon
477
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

September 4, 2026

Project location map

101 S Worthen St, Wenatchee, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.