Site work and new construction of an educational facility in Brea, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The proposed project would demolish the existing kitchen and restroom building east of Building C and replace it with a new 9,623-square-foot Multipurpose (MP) Building with a kitchen, along with an approximately 2,000-square-foot lunch canopy either west or south of the new MP Building. Additionally, five existing modular classroom buildings in the southern portion of the campus would be demolished and replaced in kind on existing asphalt with five new modular classroom buildings, each approximately 960 square feet and including a restroom. Site work would include new asphalt paving around the MP Building and a new 31-stall parking lot to the north to address existing parking shortages. The proposed project would also add new landscaping, softscaping, trees, and light poles. Construction is anticipated to take place from approximately June 2027 through July 2028. https://ceqanet.lci.ca.gov/2026080832 ---------------------------------------------------------------------- Construction of a multipurpose building and kitchen using the Lease-Leaseback delivery method. Question Deadline 08/17/2026 at 12:00 PM PT Questions regarding this RFQ/RFP should be set forth in writing and sent to the District's Assistant Superintendent of Business Services, via email to rchampion@bousd.us, and the email subject line should be specified as "Question Re FACLON ACADEMY OF SCIENCE AND TECHNOLOGY Multipurpose and Kitchen RFQ/RFP." The District intends that the Project Contractor shall perform any and all preconstruction, construction, and related services, and provide any and all equipment, materials, supplies and other things, as may be necessary and convenient to accomplish full and satisfactory completion of the Project, including, without limitation, assisting with DSA close-out of the Project. The Project Contractor SHALL NOT commence or be required to commence construction of any portion of the work that is subject to approval by the DSA prior to the District obtaining DSA approval for that portion of the work

Post-Bid

$3,700,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
622
Active Projects
225
Bidding Soon
4,125
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2026

August 1, 2027

Project location map

650 Apricot Ave, Brea, CA

Fuel growth with access to the bidding project info your business needs.