Published July 27, 2026 at 8:00 PM

Updated July 30, 2026

Site work and paving for a mixed-use development in Weston, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description: The Improvements under this Contract consist of , but are not limited to, MOT (standard, traffic control officer, barrier, barrier relocate, arrow board, crash cushion, PCMS), sediment barrier, monitor structures (inspection, settlement, vibration), bridge (removal), concrete (removal, retaining wall, barrier with junction slab, prestressed pole), asphalt (stabilization, base, superpave), steel (retaining wall reinforcing), drilled shaft, lighting (conduit, pull/splice box, junction box, conductors, under-deck luminaire, luminaire replace, luminaire remove, pole complete pole complete remove, cable distribution system), electrical (power service, service wire, load center), and ITS (maintenance, fiber optic locator), along State Road 9 (I-75) from State Road 869 (I-595) to State Road 25 (US-27) for 7.670 miles in the Town of Davie, the City of Sunrise, the City of Weston, and unincorporated portions of, Broward County. Total Roadway Length: 7.528 Miles Contract Days: 510 Total Bridge Length: 0.142 Miles Total Proposal Length: 7.670 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Flexible Question Deadline 08/19/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - 012 - Electrical - SR 93 (I-75)

GC Bidding

$7,497,679.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
86
Bidding Soon
1,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

September 7, 2026

Project location map

FL-93, Weston, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.