BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated August 3, 2026

Demolition, site work and renovation of a water / sewer project in Melbourne Beach, Florida. Completed plans call for the demolition of a water / sewer project; and for the renovation of a water / sewer project.

Removal and reconstruction of seawall, including all labor and materials. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. PROJECT OVERVIEW & SCOPE The Owner is seeking formal, line-item bids from licensed, insured Florida Marine Contractors to remove an existing, failing bulkhead and construct a new vinyl sheet piling seawall system. The project encompasses a total of 54 Linear Feet (LF) in an L-shaped configuration directly bordering a concrete boat ramp on the micro-tidal, brackish waters of the Indian River Lagoon. The boat ramp will be completely closed to all traffic for the duration of this project, allowing full land-based equipment access directly on the ramp surface (subject to surface protection requirements). 2. SITE SPECIFICATIONS & CONFIGURATION Front Seawall Segment: 17 Linear Feet facing west into the Indian River Lagoon. Return Wall Segment: 37 Linear Feet running east, flanking the south side of the boat ramp, transitioning into a sloped retaining wall toward land grading. Exposed Wall Height: Approximately 4.0 feet from the lagoon mudline to the top of the concrete cap. Jurisdiction: Town of Melbourne Beach Building Department, FDEP Central District, and U.S. Army Corps of Engineers. 3. TECHNICAL & MATERIAL REQUIREMENTS Bidders must base their pricing on the following minimum structural standards: Sheet Piling: Heavy-gauge, UV-stabilized vinyl sheets (ShoreGuard SG-425 / SG-525 or engineered equivalent). Sheet Length & Penetration: Minimum 12-foot sheets providing an 8.0-foot embedment depth (2: 1 ratio) driven into load-bearing strata past the organic muck layer. Corner Assembly: Must utilize a specialized, pre-fabricated 90 -degree interlocking corner sheet. Concrete Top Cap: Poured-in-place, 3,000 PSI marine-grade concrete cap (minimum 18" wide by 12" deep) with epoxy-coated or fiberglass rebar reinforcement. Tie-Back System: Minimum 3/4 " diameter hot-dipped galvanized or Grade 316 stainless steel rods spaced every 6 feet on-center, connected to pre-cast concrete deadmen anchors. Return wall tie-backs must not interfere with or undermine the boat ramp sub-base. Drainage: Non-woven geotextile filter fabric applied to the landward face of the vinyl sheets; JetFilter maintainable weep hole filtration units installed every 10 LF. Environmental Controls: Contractor must supply, deploy, and maintain Type II weighted turbidity curtains around the entire marine work zone.

Post-Bid

$1,200,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
88
Bidding Soon
1,569
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

October 29, 2026

Project location map

Sixth Ave, Melbourne Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.