BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated August 3, 2026

Site work and renovation of a museum in Ridgefield, Connecticut. Completed plans call for the renovation of a museum; and for site work for a museum.

Question Deadline 08/06/2026 at 11:00 AM ET- Questions or requests for information must be submitted in writing. All questions or requests for information shall be submitted to David McFate, Purchasing and Finance Manager, at purchasing@ridgefieldct.gov. Construction of a stone boundary wall and an ADA-compliant stone walkway, including site preparation, excavation, and restoration of disturbed lawn and landscaped areas. In general, the scope of services shall include, but not be limited to, the following items: - Furnish and install all required erosion and sedimentation control measures, including sedimentation fence and hay bale barriers, prior to the commencement of earthwork activities. o Clear the work area of excess debris and prepare the site for construction. o Excavate the designated area for construction of the stone boundary wall. o Construct a stone boundary wall. Wall will be approximately 75 feet long, 30 inches tall, and 18 inches thick, and will complement the historic character and appearance of the Peter Parley Schoolhouse. - Construct an approximately 50 -foot, ADA-compliant, stone walkway from the front of the schoolhouse building to the existing outhouse. o Restore all disturbed lawn and landscaped areas upon completion of construction, including final grading, seeding, fertilization, and application of hay or mulch. o Inspect erosion and sedimentation control measures no less than once per week and within twenty-four (24) hours following any rainfall event of one-half (0.5) inch or greater. Any failed erosion and sedimentation controls shall be repaired or replaced immediately. o Remove erosion and sedimentation control measures once the site has achieved permanent stabilization. o A neat and orderly project site shall be maintained throughout the duration of the project. o The awarded contractor shall be responsible for daily cleanup of the work area and final cleanup of the project site upon completion of all work. The awarded contractor shall repair any damage to Town property which may occur as a result of the project. o The Town of Ridgefield shall provide all required fill material and topsoil for the project. o The property owner shall be responsible for any surveying services required for the project. o Any work outside the scope described herein shall require prior written approval from the property owner prior to commencement. Unauthorized work shall not be eligible for additional compensation.

GC Bidding

$400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,104
Active Projects
392
Bidding Soon
8,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2026

September 10, 2026

Project location map

West Ln & S Salem Rd, Ridgefield, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.