BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 10, 2026 at 8:00 PM

Updated September 2, 2026

Site work for a water / sewer project in Danvers, Massachusetts. Completed plans call for site work for a water / sewer project.

Project State Hospital Control Valve Contract. Installation of a new prefabricated control valve vault, metering manhole, isolation valves, primary and secondary power service, controls and radio antenna. Furnish and install a pre-fabricated concrete control valve vault, including 14" electronic solenoid control valve, pipes and appurtenances, instrumentation, wiring and conduit, associated electrical equipment, and all other accessories inside the pre-fabricated vault. 2. Install isolation valves (including insertion valve) prior to vault installation, including coordination of water outages and isolation of the State Hospital Water Storage Tank with the Danvers Water & Sewer Division and Danvers Fire Department. 3. Earthwork and sitework associated with setting of the control valve vault, insertion valve, isolation valves , buried electrical duct bank, water main, and all other design scope. 4. Installation site work includes the abandonment of approximately 50 linear feet of existing 16-inch water main, the installation of approximately 65 linear feet of 14-, 16- and 20-inch ductile iron pipe, new gate valves, a new 18-inch insertion valve, new hydrant, and an above grade sampling station. 5. Demolition of an existing altitude valve vault. 6. Electrical work includes installing concrete encased primary power duct banks, pad for transformer, pad-mounted electrical cabinet, and concrete encased duct bank between control valve vault, electrical cabinet, and pole mounted antenna. 7. Clearing, grubbing, and earthwork associated with installation of the concrete encased primary and secondary power duct banks. 8. Surface restoration includes installing protective fencing around the control valve vault, site grading, repair of stone pathway, and loaming and seeding. Question Deadline 09/03/2026 Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: Amy Lemos, or sent via email to Lemos.Amy@wseinc.com. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

GC Bidding

$776,950.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
702
Active Projects
346
Bidding Soon
4,454
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

October 19, 2026

Project location map

Multiple Locations, Danvers, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.