BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 18, 2026

Renovation of a municipal facility in Sudbury, Massachusetts. Completed plans call for the renovation of a municipal facility.

Flynn Building Boiler Project. Sealed bids for furnishing all labor, materials, equipment, supervision, tools, permits, testing, startup, commissioning, and incidentals necessary to provide a complete, operational condensing hot water boiler systems including all required demolition. A. Furnish all labor, materials, equipment, supervision, tools, permits, testing, startup, commissioning, and incidentals necessary to provide complete, operational condensing hot water boiler systems as specified herein. B. Work includes furnishing and installing: 1. Demolition and legal disposal of one ( 1) existing PK boiler, associated pumps, accessories, venting, and related appurtenances. 2. Furnishing and installation of two (2) new high efficiency 500 MBH condensing boilers providing a total installed capacity of 1,000 MBH. 3. Installation of a primary-secondary piping system serving the existing fourteen ( 14) heating zones to ensure proper hydraulic separation and maintain minimum boiler flow requirements. 4. Furnishing and installation of all required boiler pumps and system pumps. 5. Replacement of system pumps with new variable frequency drive (VFD) controlled pumps. 6. Installation of new combustion air and flue venting systems. 7. Installation of new natural gas piping and associated accessories. 8. Installation of condensate neutralization equipment. 9. Installation of magnetic dirt separation equipment. 10. Electrical power and control wiring. 11. Factory control systems. 12. Boiler trim and safety devices. 13. Lead/lag sequencing controls. 14. BACnet communication capability. 15. Factory-authorized startup and commissioning. 16. Owner training C. All work shall comply with: 1. Massachusetts General Laws Chapter 149. 2. Massachusetts State Building Code (780 CMR). 3. Massachusetts Fuel Gas and Plumbing Code. 4. Massachusetts Electrical Code (527 CMR 12.00). 5. NFPA 54. 6. ASME Boiler and Pressure Vessel Code. 7. All applicable federal, state, and local regulations. 1.2 BASIS OF DESIGN A. The basis of design is: Lochinvar FTX500 Condensing Hot Water Boiler B. The basis of design establishes the level of quality, performance, efficiency, and features required. C. Manufacturers offering equipment other than the basis of design shall demonstrate full compliance with this specification. D. Approved manufacturers include: o Lochinvar Cleaver-Brooks Patterson-Kelley Aerco RBI Weil-McLain Approved Equal

Post-Bid

$125,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
888
Active Projects
481
Bidding Soon
5,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

September 14, 2026

Project location map

278 Old Sudbury Rd, Sudbury, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.