Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 13, 2026 at 8:00 PM
Updated August 19, 2026
Renovation of a municipal facility in Sudbury, Massachusetts. Completed plans call for the renovation of a municipal facility.
Flynn Building Boiler Project. Sealed bids for furnishing all labor, materials, equipment, supervision, tools, permits, testing, startup, commissioning, and incidentals necessary to provide a complete, operational condensing hot water boiler systems including all required demolition. A. Furnish all labor, materials, equipment, supervision, tools, permits, testing, startup, commissioning, and incidentals necessary to provide complete, operational condensing hot water boiler systems as specified herein. B. Work includes furnishing and installing: 1. Demolition and legal disposal of one ( 1) existing PK boiler, associated pumps, accessories, venting, and related appurtenances. 2. Furnishing and installation of two (2) new high efficiency 500 MBH condensing boilers providing a total installed capacity of 1,000 MBH. 3. Installation of a primary-secondary piping system serving the existing fourteen ( 14) heating zones to ensure proper hydraulic separation and maintain minimum boiler flow requirements. 4. Furnishing and installation of all required boiler pumps and system pumps. 5. Replacement of system pumps with new variable frequency drive (VFD) controlled pumps. 6. Installation of new combustion air and flue venting systems. 7. Installation of new natural gas piping and associated accessories. 8. Installation of condensate neutralization equipment. 9. Installation of magnetic dirt separation equipment. 10. Electrical power and control wiring. 11. Factory control systems. 12. Boiler trim and safety devices. 13. Lead/lag sequencing controls. 14. BACnet communication capability. 15. Factory-authorized startup and commissioning. 16. Owner training C. All work shall comply with: 1. Massachusetts General Laws Chapter 149. 2. Massachusetts State Building Code (780 CMR). 3. Massachusetts Fuel Gas and Plumbing Code. 4. Massachusetts Electrical Code (527 CMR 12.00). 5. NFPA 54. 6. ASME Boiler and Pressure Vessel Code. 7. All applicable federal, state, and local regulations. 1.2 BASIS OF DESIGN A. The basis of design is: Lochinvar FTX500 Condensing Hot Water Boiler B. The basis of design establishes the level of quality, performance, efficiency, and features required. C. Manufacturers offering equipment other than the basis of design shall demonstrate full compliance with this specification. D. Approved manufacturers include: o Lochinvar Cleaver-Brooks Patterson-Kelley Aerco RBI Weil-McLain Approved Equal
Post-Bid
$125,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2026
September 14, 2026
278 Old Sudbury Rd, Sudbury, MA
Related To This Project
Sudbury, MA
Bid Date: Aug 26 2026
Sudbury, MA
Bid Date: Jul 17 2026
Sudbury, MA
--
Sudbury, MA
Bid Date: Jul 17 2026
Sudbury, MA
Bid Date: Jun 11 2026
Sudbury, MA
Bid Date: Jun 26 2026
Sudbury, MA
Bid Date: Jun 11 2026
Sudbury, MA
Bid Date: Jun 19 2026
Sudbury, MA
Bid Date: Jun 15 2026
Sudbury, MA
--
Sudbury, MA
Bid Date: Jun 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
