BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 3, 2026

Renovation of a warehouse / distribution facility in Benton, New Hampshire. Completed plans call for the renovation of a warehouse / distribution facility.

Replace elevator machinery, adjust fire sprinklers, upgrade elevator cab, repair damaged elevator shaft CMU and replace shaft roof. Install Mini split AC system in machine room. The Project will include the Discipline(s) of: Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Specialties, Equipment, Conveying Systems, Mechanical, Electrical. Bidders should act promptly and submit all questions in writing to J Wyatt Porter-Brown, fax 603/271-3515, e-mail james.a.porter-brown@das.nh.gov in accordance with explanation to bidders - instructions to bidders, document 00204 - part 13. All individuals, firms, partnerships or corporations intending to bid, before obtaining plans and specifications, must file with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids, a statement showing their qualifications. No valid bidding proposal will be issued to a prospective bidder who is not qualified. The right is reserved to waive any informalities in or to reject any or all proposals. NH DOT - Glencliff Home Warehouse Elevator Repair

Sub-Bidding

$2,200,000.00

Public - State/Provincial

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
42
Bidding Soon
1,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

September 18, 2026

Project location map

393 High St, Benton, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.