Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 10, 2026 at 8:00 PM

Updated August 16, 2026

Site work for a bridge / tunnel in Lytton, British Columbia. Completed plans call for site work for a bridge / tunnel.

The Contract is generally for the following work: Nohomin Creek: Remove three existing 1300mm culverts and replace with one 15 meter long 2400x1500mm precast box culvert with inlet and outlet headwalls. Nickeyeah Creek: Remove two existing 1200mm culverts and replace with one 12.5 meter long 3050x1500mm precast box culvert with inlet and outlet headwalls. Skwayaynope Creek: Remove two existing 900mm culverts and replace with one 10 meter long 1800x1200mm precast box culverts with inlet and outlet headwalls Documents can be obtained from https://urbansystems.bidsandtenders.ca/ Bid values are undisclosed.

Bid Results

$2,500,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2026

September 1, 2026

Project location map

Multiple Locations, Lytton, BC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed