BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2026 at 8:00 PM

Updated August 14, 2026

Renovation of a military facility in Reno, Nevada. Completed plans call for the renovation of a military facility.

Scope of Work & Detailed Specifications shall be performed on an "as-needed" basis. 9.1.1 General Intention: This Scope of Work is intended to include all work required to complete the tasks described below Task(s): The contractor shall install specified carpet, cover base, all related required materials and accessories to perform project completion of the carpet replacement project of specified office areas. The contractor is also responsible for all materials, tools, hardware, and labor to complete this project. Contractor is also responsible for properly disposing of all materials that have been removed from this project. a. Old carpet flooring removal and disposition of all existing carpet tiles regardless of fiber type without any damage to the substrate floor. b. All old carpet/carpet tiles , flooring and related debris must be removed from plot boundaries. c. Old cove base removal and disposition from plot boundaries. d. Install a new 4 1/2 " rubber cove base to proper specifications. Install new transition strips in doorways. f. Relocation of furniture to install new carpet tiles will be done by a moving company. a. All equipment disconnections will be done by the Office of the Military. b. All equipment/printer/plotters/IT items will be relocated by the Office of the Military. c. All personal items will be removed by the Office of the Military. g. Surface preparation is required to receive the new carpet tiles . (e.g. Leveling of subfloor, removal of old adhesives.) h. Installation of new carpet tiles Tarkett Carpet Tile, Style Savant G0041 - Natural Blush 76206 and rubber cove base packaged condition. i. Replacement of door stops or related hardware (if removed during flooring removal). All bid proposals shall also include the total cost of project work including all labor, materials, equipment and services to complete installation. This is not an ongoing service contract, and vendors are not required to provide hourly rates for each year of the contract. This is not a prevailing wage job. 9.1.3 Vendor shall contact site manager no less than TWO (2) working days prior to monthly site visit to coordinate escorted access to buildings. 9.1.4 All work shall be performed in accordance with applicable laws, regulations, codes, and ordinances of state and local agencies. 9.1.5 All carpet replacement services shall be performed by personnel employed and supervised by the Bidder. Bidder shall provide information in technical supervision through a competent foreman, as required, to implement modern methods and newly developed horticulture procedures 9.1.6 Service could be required on a one-time, as-needed, quarterly, semi-annual, and annual basis. 9.1.7 If this is an ongoing service contract, vendors must provide hourly rates for each year of the contract, considering costs related to inflation. 9.1.8 The geographical locations you are willing to serve must be specified in your bid proposal. The Office of the Military is currently seeking bids for the following locations: Las Vegas, including any new building(s) to be built or acquired by the Office of the Military within the geographical location selected. When building(s) is reassigned and are no longer the responsibility of the Office of the Military, the Office of the Military will notify the contractor that said building(s) would no longer be covered under this contract. The contract status will not change based upon changes in assignment, whether by acquiring or by no longer having ownership of said building(s). The contract will remain in full effect and will cover or remove said building(s) within the geographical location selected.

Post-Bid

$240,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
30
Bidding Soon
476
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2026

September 7, 2026

Project location map

685 E Plumb Ln, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.