BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2026 at 8:00 PM

Updated August 5, 2026

Site work and paving for a sidewalk / parking lot in Columbus, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Each proposal must be accompanied by a BID GUARANTY, meeting the requirements of Section 153.54 of the Ohio Revised Code. No bidder may withdraw their bid within sixty (60) days after the actual date of the opening thereof. Contact Melissa Price at 614-265-6369 with any questions regarding bidding. The Director of Natural Resources reserves the right to reject any or all bids, or to accept the bid which embraces such combination alternate proposals as may promote the best interest of the State. For information regarding the project, the primary contact person is the Project Engineer, Ronald Warner, at the Cambridge District Office 1-740-303-4209. Or in their absence you may contact the Project Officer, RobertMeyer, at the McArthur District Office 1-740-274-4959. Question Deadline 09/10/2026 at 1:30 PM ET Contact Melissa Price at 614-265-6369 with any questions regarding bidding. The Tecumseh Lake Trailhead project is located Salt Lick Township, Perry County, Ohio. Directions to the site are as follows: From the Town of New Lexington, Ohio travel South on S.R. 93 for approx . 8.6 miles to the intersection of S.R. 93 and S.R. 155 in the town of Shawnee, Ohio . Turn right and travel South on S.R. 93 for 400 feet and the project entrance is located on the left side of the road. The project's latitude and longitude are 39.60197_, -82.21268. The closest address to the site is 8273 S. R. 93 Shawnee, Ohio 43782. The project is located in the Tecumseh Lake and Picnic Area, managed by the US Forest Service (USFS), with trails managed by the Buckeye Trail Association. This project includes construction of a paved pedestrian path adjacent to S.R. 93, construction of a paved asphalt pedestrian path adjacent to Township Road 457/Tecumseh Lake entrance, installation of a prefabricated modular retaining wall and new gravel parking area. The scope of work also involves but is not limited to clearing within the spillway limits of Tecumseh Lake, maintaining traffic, debris removal and disposal, placement of compacted fill, installation of culvert(s), underdrains and outlet pipe(s), placement of various signage, installation of sediment controls and revegetation of the site.

GC Bidding

$454,720.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
122
Bidding Soon
2,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

October 12, 2026

Project location map

Multiple Locations, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.