BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 2, 2026

Site work and paving for a mixed-use development in Delavan, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Ih 43 Rock Freeway The pavement needs to be replaced and structures need treatment to extend their service lives. WisDOT led perpetuation project to replace the pavement of approximately 7.0 miles of IH 43 in Walworth County from STH 50 to USH 12. The pavement including on and off ramps will be replaced. Additional work includes guardrail replacement, culvert pipe repair/replacement, curb ramp replacement, FTMS fiber installation along the corridor, signing, pavement marking replacement and bridge rehabilitation. Consultant design services include drainage, signing, traffic control, signals, lighting, structures, plat development and utility coordination. Anticipated Construction Cost: $45,000,000 OR GREATER The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - Perpetuation - Pavement Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$45,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
589
Active Projects
258
Bidding Soon
4,825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

Project location map

IH-43, Delavan, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.