BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 5, 2026

Site work and paving for a mixed-use development in Rock Springs, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Wisconsin Dells - Portage I-90/94 modernization project expanding interstate mainline between STH 23 and STH 12 Interchange, reconstructing STH 12 Interchange, new overpass bridges at Xanadu and Ishnala and new bridges over Mirror Lake due to safety and operational concerns This is a Design Build Project and will reconstruct and expanded 2.8 miles of I-90/94 between STH 23 and STH 12 Interchange in Sauk County. This project will reconstruct STH 12 Interchange, new overpass bridges at Xanadu and new interstate bridges at Ishnala, STH 12 and over Mirror Lake due to safety and operational concerns. A new Diverging Diamond Interchange (DDI) will be construction at the interchange of STH 12 and I-90/94. Services in the first contract will assist the Department with plan reviews, including evaluating Alternative Technical Concepts. Additional contracts will be awarded from this solicitation for the multi-year construction oversight of the Design Build project. Consultant firms hired by a municipality as a contracted municipal engineer may not compete for contracts that WisDOT is a party to that impact the municipality per FDM 8-5-3.4. Effected municipalities include the Town of Delton and the Village of Lake Delton. Anticipated Construction Cost: $45,000,000 OR GREATER The Method of Contractor Selection Has Not Been Determined at This Time. WI DOT - RFP Engineering - Construction Services for Modernization - Reconstruction Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

$45,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
85
Bidding Soon
1,410
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2027

Project location map

IH-90, Rock Springs, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.