BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 3, 2026

This is a service / maintenance or supply contract in Peoria, Illinois. Contact the soliciting agency for additional information.

The Complexity Factor for this project is 0 The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 21, 2026, at 1:30 PM at the Region Three/District Four Office in Peoria Phase I/II engineering services are required to provide work on various projects throughout District Four. Phase I work, if required, may consist of conducting route surveys, land surveys, hydraulic surveys, hydraulic analyses, geometric analyses, environmental studies, preparing Bridge Condition Reports, Hydraulic Reports, Structure Geotechnical Reports, Type, Size, and Location (TS&L) plans, Intersection Design Studies (IDSs), and Project Reports (categorical exclusion projects only). This work may include data collection, development of alignment alternatives, cost estimates, traffic management cost analyses, transportation management plans, crash analyses, geometric studies, traffic studies, drainage studies, structure borings, geotechnical analysis and reporting, analysis of existing pavements including obtaining pavement cores, and all other related work required to produce the necessary Phase I documents and reports. Phase II work, if required, may consist of conducting route surveys, land surveys, hydraulic analyses, structure plans, roadway plans, drainage plans, geometric plans, geotechnical analyses, and reporting, drilling, and analysis of soil borings, traffic signal plans, traffic staging plans, temporary and permanent erosion control plans, plats and legal descriptions for Right-ofWay acquisition, and any other related work required to complete plans, specifications and estimates as necessary. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 032 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties

Conceptual

$2,000,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
85
Bidding Soon
1,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2027

Project location map

Multiple Locations, Peoria, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.