BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2026 at 8:00 PM

Updated August 5, 2026

Site work and paving for a bridge / tunnel in Golconda, Illinois. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 4, 2026, at 10:00 AM at the Region Five/District Nine Office in Carbondale. Phase I/II Engineering Services are required to perform work associated with the reconstruction/replacement of the bridge carrying IL 146 over Hills Branch in Pope County. The existing structure is a three span concrete arch deck, open spandrel structure. As such, this bridge has a primary designation on the Historical Bridge List. Phase I is expected to include the preparation of a Project Report, anticipated to be a Federally Approved Categorical Exclusion. If it is determined that there are no feasible alternatives to a complete structure replacement, Section 106 and 4(f) processes shall be followed. Phase I Engineering Services shall include but not limited to conducting roadway surveys, hydraulic surveys, drainage studies, hydraulic analysis, geometric studies, environmental impacts and coordination, data collection, cost estimates, typical sections, developing construction limits, utility conflicts and relocations. In addition, prepare the following reports: Bridge Condition Report, Hydraulic Report, Structure Geotechnical Report (SGR), and Type, Size and Location (TS&L) plan. Public Involvement is expected to include stakeholder and agency coordination, as well as the preparation of exhibits and all other materials for these meetings and coordination with resource agencies and/or special interest groups. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Structures (Highway: Complex) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 44 - RFQ Engineering - IL 146 Over Hills Branch, Phase I/II Proj

Conceptual

$2,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
52
Bidding Soon
777
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2027

Project location map

IL-146, Golconda, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.