BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2026 at 8:00 PM

Updated August 11, 2026

Demolition, site work, paving, outdoor lighting and renovation of a mixed-use development in Lawrenceville, Georgia. Completed plans call civil work for a road / highway and sidewalk / parking lot.

The work to be performed by the General Contractor consist of but is not limited to the following major items Night Work: Contractor shall perform all construction activities between the hours of 9:00 PM and 5:00 AM. Include all costs associated with night work, traffic control, lighting, labor, and equipment. Electrical pedestrian lighting, including concrete lighting pole foundations (per manufacturer's specifications), decorative street/parking lighting, wiring, conduits, pull boxes, electrical service components, and all associated electrical infrastructure in accordance with the plans. Demolition and removal of existing pavement, curb and gutter, sidewalks, driveway apron, landscape features, striping (gridding), signage, utilities, and other improvements as required by the plans. Mobilization: project management, traffic control, erosion and sedimentation control, and all associated temporary construction measures. (18-24 Inch)varies Curb & Gutter: Removal and replacement or installation of concrete curb and gutter, including standard and mountable curb sections (steel), as required by the plans. 4-Inch-thick Sidewalk: Removal and replacement or installation of concrete curb and gutter, including standard and mountable curb sections, as required by the plans. Contractor to follow Gwinnett County/GDOT Standards. 8-Inch thick reinforced Concrete Driveway Apron: Removal and replacement or installation of concrete curb and gutter, including standard and mountable curb sections, as required by the plans. Contractor to follow Gwinnett County/GDOT Standards. Construction activities including night work, traffic control, electrical pedestrian lighting and infrastructure installation, demolition and removal of existing pavement and curbs, mobilization, curb and gutter replacement, and concrete sidewalk installation.

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
367
Active Projects
140
Bidding Soon
2,113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2026

November 2, 2026

Project location map

S Clayton St & S Perry St, Lawrenceville, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.