Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 3, 2026 at 8:00 PM

Updated October 9, 2026

Renovation of a museum in Belmont, Wisconsin. Completed plans call for the renovation of a museum.

In general, the work consists of: a comprehensive site and building maintenance and improvement project at the First Capitol Historic Site in Belmont. The Council House and Court House buildings are listed on the National Register of Historic Places and therefore the Secretary of the Interior's Standards for the Treatment of Historic Properties apply. Historic materials that are intact and/or repairable will be maintained and preserved in place. Materials that are deteriorated beyond repair will be replicated. Other buildings and features on the site are not historically significant and will be removed to allow for new structures and features that better suit the site's use as an educational facility. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Question Deadline 09/19/2026 If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, bidders shall bring inadequacies, omissions or conflicts to the Architects/Engineer's attention at least ten (10) days before GPC bid opening. Prompt clarification will be supplied to all bidders of record by addendum.

Post-Bid

$1,930,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
75
Bidding Soon
1,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2026

November 30, 2026

Project location map

18904 Co Rd G, Belmont, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed