Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2026 at 8:00 PM

Updated September 17, 2026

Site work, new construction and renovation of a municipal facility in Nutter Fort, West Virginia. Completed plans call for the construction of a municipal facility; and for the renovation of a municipal facility.

Dewatering of Pitcairn mine via horizontal bore and curtain drains, installation of a stormwater conveyance system including new installation and replacement of existing stormwater features, pipe ranging from 12 to 72 inches, culvert lining, concrete inlets, manholes, wingwalls, tie-ins, utility relocations, slope stabilization, trench repairs, and surface restorations. Bonds: 5% Bid Bond, Certified Check required. Dewatering of Pitcairn mine via horizonal bore and curtain drains. Bores are 12" fused HDPE pipe and may total 2,900' if all proposed bores are deemed necessary. Curtain drains are approximately 1,250 LF of 12" PVC. Installation of a stormwater conveyance system that includes new installation and removal and replacement of existing stormwater system features. Stormwater system includes approximately 6,400 LF of 12" - 72" pipe, lining of two (2) existing culverts, concrete inlets, manholes, and wingwalls, tie-ins, utility relocations of water and sewer lines, Arbutus Park Drive slope stabilization, trench repairs, and surface restorations. Question Deadline 09/03/2026 Estimate : $9,000,000.

Post-Bid

$9,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
62
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

November 9, 2026

Project location map

1415 Buckhannon Pike, Nutter Fort, WV

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed