BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2026 at 8:00 PM

Updated August 24, 2026

Demolition, site work, asbestos abatement and new construction of a mixed-use development in Tallahassee, Florida. Completed plans call for the construction of a 38,500-square-foot educational facility.

The general scope of work for the Raa Middle School Gymnasium project includes demolition of the existing gymnasium building (Building 10) and the construction of a new 38,500SF building comprised of a gymnasium, stage, four music arts classrooms, lobby, locker rooms, mezzanines, utility yard, and supporting spaces. Scope of work includes, but is not limited to, selective demolition and asbestos abatement, site clearing and grading, a new storm water management facility and drainage system, concrete, masonry, structural steel, metal roof and wall panels, cabinetry, aluminum storefront, glass and glazing, doors, frames, hardware, overhead doors, specialties, gypsum board assemblies, acoustical ceilings, ceramic tile, resinous flooring, LVT, carpet, wood gymnasium flooring, paints and coatings, aluminum walkway canopies, signage, food service equipment, stage curtains, audio visual equipment, gymnasium equipment, bleachers, lockers, fire sprinkler, plumbing, HVAC, electrical, and exterior improvements. This project represents the first phase in a series of improvements planned for Raa Middle School , ultimately leading to the reconstruction of the entire campus in accordance with the new master plan. The master plan includes a new gymnasium, two multistory classroom buildings, an administration and media center building, and a new parent drop off/pickup lane on the south side of campus, followed by demolition of most existing buildings and construction of new sports fields on the north side of campus. Utilities installed as part of this phase will be sized and configured to support the future campus buildings and site improvements. Bonds: $100,000 Performance Bond, $100,000 Payment Bond. Deadline for pre-bid RFIs is 12:00PM , Friday, August 14, 2026. Submit all questions via email to susan@rippeeconstruction.com

Sub-Bidding

$3,000,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
43
Bidding Soon
498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 5, 2026

Project location map

401 West Tharpe Street, Tallahassee, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.