BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 4, 2026 at 8:00 PM

Updated August 8, 2026

Site work, paving, outdoor lighting and renovation of a mixed-use development in Elgin, Illinois. Completed plans call for the renovation of a road / highway; for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The proposed work includes, but is not limited to, 7 alleys and 4 parking lots making up the base bid, and 1 alley as an alternate bid location. All the alleys and parking lots are located throughout the City of Elgin, Illinois. Their improvements include, but are not limited to, HMA removal/replacement, PCC pavement removal/replacement, aggregate base repair, curb and gutter removal and replacement, sidewalk & ADA curb ramp upgrades, removal and replacement of light pole & pole foundation, pavement striping, frame adjustments, and drainage improvements, where applicable. Locations of these improvements are as follows: 1 ) 169 Dexter Avenue parking lot; 2) The Centre of Elgin North parking lot; 3) Alley Between 109 and 113 E. Highland Avenue (South of Highland Avenue); 4) Elgin Fire Station No. 3 parking lot (2455 Royal Blvd.); 5) LaSalle Place alley between Wing Street/N . McLean Blvd. and Kaskaskia Avenue; 6) LaSalle Place alley between Harlan Avenue and Kaskaskia Avenue; 7) Kaskaskia Avenue alley between Kane Avenue and the west terminus; 8) North Spring Street alley between Lovell Street and Center Street; 9) North Spring Street alley between Cooper Avenue and Slade Avenue; 10) North Spring Street alley between Slade Avenue and Lincoln Avenue; 11 ) Oakland Avenue alley between Liberty Street and Preston Street; and (Alt. ) 12) Parking lot located at the intersection of Fulton Street and Villa Street. The total length of the project's alleys is 3,339 FT (0.63 miles); the total area of the project's parking lots (base bid) is 4,384 SY; and the alternate bid parking lot area is 1,799 SY. Bonds: 5% Bid Bond, Certified Check required Question Cuttoff Date & Time 8/7/2026 12:00:00 PM (ET) Questions regarding the bidding process, bonds, or bidding software can be directed to Nickon Etminan , Procurement Manager at (847 ) 931-5606 or nickon.etminan@elginil.gov. Questions regarding this bid package can be directed to Aaron Neal, Public Works Superintendent by email at neal_a@cityofelgin.org. Technical questions regarding the scope of work, must be submitted and should be addressed to Doug Masters, Project Manager, Thomas Engineering Group, LLC by email at dougm@thomasengineering.com .

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
635
Active Projects
294
Bidding Soon
4,699
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2026

October 12, 2026

Project location map

Multiple Locations, Elgin, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.