BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2026 at 8:00 PM

Updated August 5, 2026

Site work and new construction of an educational facility in N Chelmsford, Massachusetts. Conceptual plans call for the construction of a educational facility.

The Town plans to replace the existing Parker Middle School with a new middle school facility designed for 1,390 students in grades 4 through 6 on Crooked Spring Road. The project has advanced into the preferred schematic design phase following approval by the Massachusetts School Building Authority Board. Site improvements include traffic circulation upgrades, parent and bus loops, athletic fields, courts, playgrounds, green space, and a natural restoration area. The estimated total project cost is $264 million with a construction budget of $211.1 million. Architect involvement is indicated through the schematic design phase and site plan materials.

Conceptual

$264,000,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
822
Active Projects
352
Bidding Soon
5,243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.