BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 8, 2026 at 8:00 PM

Updated August 17, 2026

Demolition, site work and renovation of a multi-residential development in Clewiston, Florida. Completed plans call for the renovation of a multi-residential development; and for the demolition of a multi-residential development.

Indoor Air Quality (IAQ) repairs and ADA flooring replacements, including demolition, surface cleaning, duct sanitizing, drywall installation, moisture-resistant drywall, ceramic floor installation, shower/tub area tile work, plumbing fixture reinstallation, and painting. When installing new drywall in bedroom, living room, etc. , backing must be provided for TVs being mounted on the wall Place a chase and an outlet at the same area where backing is located Seal all recess lighting, caulk the lights to the ceiling Caulk around all exterior lights All exterior light fixtures must be LED Any penetration that are made through the wall to the exterior must be caulked or sealed Any new gutters must have leaf guard Any roof repairs/replacement must follow Miami-Dade standards BATHROOM: All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood Due-rock on walls in the shower or tub area All joints, corners, and around windows must be sealed with red guard Extend the Dur-rock 2' on all sides beyond the shower or tub Shower floor mortar bed, no foam or any other products should be used Minimum 2-4% pre-slope Liner should be water tested for 24 hours Minimum 6 inches All floor tile should be slip/skid resistant Shower floor tile should be a maximum of 2x2 mesh o Provide backing for all walls inside tub/shower areas between 32" and 38" o Faucets should be Kohler or Delta From shower diverter to shower head piping must be copper tubing and copper fittings Secure the diverter and pipe fittings securely When tiling the walls extend 2 feet passed the shower or tub o o ADA bathroom the entire bathroom must be tile a minimum of 4 feet oAll toilets must be Kohler highline oAll exhaust must be vented through the roof or soffit The exhaust fan and light for the bathroom must be on the same switch All paint must be high gloss KITCHEN: All wood cabinets are required at all times, when like for like is stated if current cabinet is particle board, include in the bid the price to replace with all wood Faucets should be Delta with a pull out spray hose All sinks should be deep double drop in sinks Moisture resistant (purple) drywall Cabinet screws should be a minimum of 2 1/2 inches Efforts should be made to find a stud If drywall is removed from floor to ceiling, blocking must be provided for upper and lower cabinets All microwave and kitchen hoods must be exhausted outside MECHANICAL/HVAC: All AC units must be installed on a metal stand with a secondary pan and connect float switch A primary float switch must be installed and connected When replacing duct work all joints and seams must be taped and mastic All new HVAC units must be a minimum of 16 seer All flexible ducts mut be a minimum of R8 R-value All disconnects should be the pull type non-fuse Rheem, Goodman, Night and Day units preferred o Caulk around all AC vents oKeyed lockout caps must be on all units WATER HEATERS: o GE brand, replaced like for like gallon size Drain pan required o TRV piped to the outside o All water heaters should have a separate shut off switch o New code required Energy conservation code chapter 4 o Heat traps are mandatory Question Acceptance Deadline 08/14/2026 05:00 PM EDT Questions are submitted online Yes. All submission- and Pre-Bid Conference-related questions, inquiries, concerns, and communication must be routed through the following Contact Person(s): Name: Christian Vaquedano, Email: To: Christian Vaquedano@semtribe.com Cc: BidSubmissions@semtribe.com, Phone: O: (954) 966-6300 x10967 C: (954) 882-1538

Sub-Bidding

$470,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
171
Bidding Soon
2,562
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2026

September 21, 2026

Project location map

30000 Codys Wy, Clewiston, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.