BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 17, 2026

Renovation of a conference / convention center in Boston, Massachusetts. Completed plans call for the renovation of a conference / convention center.

Questions or requests for information, clarification or interpretation of the bidding documents must be submitted to procurement@ massconvention.com in writing in accordance with the Instructions to Bidders and must be received no later than 5:00 p.m. on August 18, 2026. This project includes providing all labor, materials and equipment necessary to provide comprehensive modernization of passenger/ service elevators EL-B3 and EL-B4, and freight elevator EL-B5 within the North Lobby of the Memino Convention & Exhibition Center (MCEC). Classified as a Level 1 Alteration under the Massachusetts Existing Building Code, the intervention replaces the building's original, obsolete 2004 Fujitec systems with non-proprietary, open-source technology to eliminate procurement risks and ensure long-term serviceability. The scope includes replacing geared traction machines with units featuring emergency secondary brakes, updating controllers to VVVF microprocessor drives, and installing robust car safeties and overspeed governors. Furnish and install a front-of-house access barrier to shield the work zone and restrict public access during construction, including thirdshift, non-dark-day operations. Each bid shall be submitted and will be considered in accordance with the Instructions to Bidders and other Contract Documents, and shall be accompanied by a bid deposit in the amount of 5% of the value of the bid. Sub-bids on this contract must be accompanied by a copy of a Certificate of Eligibility issued by DCAMM showing that the sub-bidder has been certified to participate in the public construction projects and to perform the work required. FILED SUB-BIDS FOR THIS PROJECT: Elevator: $2,047,000.00 Electrical Work: $417,682.00 HVAC: $ 66,500.00 The Authority reserves the right to waive any informality in or to reject any or all bids if it be in the public interest to do so.

Sub-Bidding

$2,047,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
761
Active Projects
405
Bidding Soon
4,705
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

October 1, 2026

Project location map

415 Summer St, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.