BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 18, 2026

Site work and paving for a road / highway in Vancouver, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This Contract provides for the removal of one northbound travel lane between NE 39th Street and NE Hazel Dell Avenue. A protected two-way bicycle facility will be implemented between E 40th Street and NE 45th Street. Between the southern driveway of Covington House and NE 45th Street, a separated two-way pedestrian path will be constructed adjacent to the bicycle facility. Enhanced bicycle crossings will be provided at the intersections of F Street with E 39th Street and E 40th Street. In addition, shared lane markings (sharrows) will be installed on F Street between E 39th Street and E 40th Street and other work, all in accordance with the attached Contract Plans, these Contract Provisions and the Standard Specifications. The Contract Work shall be Physically Complete within 75 Working Days from the Notice to Proceed. WSDOT PROJECT NUMBER - HLP-4253(017) WSDOT CONTRACT NUMBER - TA-8562

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
69
Bidding Soon
1,361
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2026

October 26, 2026

Project location map

Multiple Locations, Vancouver, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.