Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 8, 2026 at 8:00 PM

Updated October 14, 2026

This is a service / maintenance or supply contract in McConnell AFB, Kansas. Contact the soliciting agency for additional information.

Amendment 4 - The purpose of this amendment is to: 1. Respond to clarifying questions that may impact proposal prices. 2. Provide updated Attach 12 - PRQE 250006 - SOW Attach 2 - B412 Drawings 6 Oct 2026. *Please reference L.1.1.5 in the solicitation on amendments acknowledgements. ----------------------------------------------------------------------------------------------------------------------------- Amendment 3 - The purpose of this amendment is to: 1. Extend the Proposal Due Date 14 October 2026, due to late questions that may impact proposal prices. *Please note that the answers to the questions above will be released in a seperate amendment as responses are developed. ----------------------------------------------------------------------------------------------------------------------------------------- Amendment 2 - The purpose of this amendment is to: 1. Extended the proposal due date from 30 September 2026 to 7 October 2026. 2. Respond to final set of questions. 3. Provide updated Attach 12 - PRQE 250006 - SOW Attach 2 - B412 Drawings based on Q&A. 4. Provide updated Attach 13 - PRQE 250006 - SOW Attach 3 - B1099 Drawings based on Q&A 5. Addition of Point of Contact in Section L.1.1.2 6. Provide updated Attach 10 - PRQE 250006 - SOW 25 Sep 26 Please note that Q&A Attachments 2, 3, and 4 are attachments that answer corresponding questions in the Q&A. * Please note that Attach 11 - PRQE 250006 - SOW Attach 1 - Specifications was changed in Amendment 1 but was not included in the summary of changes. --------------------------------------------------------------------------------------------------------------------------------------- Amendment 1 - The purpose of this amendment is to: 1) Update to R-DFARS Clause 252.204-7021 from CMMC Level 2 (C3PAO) to CMMC Level 2 (Self). 2) Update to R-DFARS Clause 252.204-7025 from CMMC Level 2 (C3PAO) to CMMC Level 2 (Self). 3) Adjusted Attach 1 General Statement of Work to include requirement in H.9.0. 4) Update to R-DFARS Clause 252.215-7012. 5) Update to SF1442 Box 13.b. 6) Update to Attach 9 changing name from Bid Schedule to Price Schedule. 7) Provide meeting minutes and information from Pre-Proposal Conference and Site Visit. 8) Respond to questions received both prior to and as follow-up from the Pre-Proposal Conference and Site Visit. 9) Adjust all question due date from five (5) business days after pre-proposal conference to seven (7) making all questions due on 21 September. 10) Add Attach 16 - Q&A Attachment 1 *Please note: There are two separate sets of Q&A. Please be sure to review all amendment attachments. Documents that are changed due to the Q&A will be provided in the next amendment. Provide a wide range of construction services under a Multiple Award Construction Contract (MACC) as an Indefinite-Delivery Indefinite-Quantity (IDIQ) program. Work includes design-build projects; renovations; additions and upgrades; new construction involving multiple construction trades and disciplines; and the repair and replacement of roadways, airfield taxiways, and runways. Services may require complete project design from concept development or from a performance-based statement of work. Furnish all labor, materials, equipment, tools, transportation, and incidental items necessary to complete individual projects from conception through completion. Task orders will be issued on a firm-fixed-price basis for projects ranging in value from approximately $2,000 to $10,000,000. The contract program has a total ceiling value not to exceed $99,000,000 over a potential six-year ordering period, consisting of a 24-month base period and two 24-month option periods. A seed project, Repair Foundation B1099 and B412, will be used for evaluation and pricing purposes and includes multiple construction disciplines. Awardees will compete for individual task orders issued under the contract vehicle and will be required to participate in a mandatory partnership/pre-construction meeting following contract award. Location: McConnell Air Force Base, Kansas. Additionally, any questions or request for information are due no later than 2:00 p.m. on 14 September 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

$4,500,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
26
Bidding Soon
461
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2026

November 6, 2026

Project location map

To Be Determined, McConnell AFB, KS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed