BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 9, 2026 at 8:00 PM

Updated August 15, 2026

Site work and renovation of a bridge / tunnel in Westford, Massachusetts. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

Bridge repair work including general site coordination, potential structural and surface improvements as required for bridge maintenance. Bonds: 5% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. The Work consists of repairing two existing 36-inch by 58-inch corrugated metal pipe arches using a glass fiber reinforced plastic cured-in-place pipe (GRP-CIPP) liner cured using an ultraviolet (UV) light process, along with all other miscellaneous work necessary to support the bridge repairs as specified in the contract documents.

GC Bidding

$250,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
871
Active Projects
446
Bidding Soon
5,555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 21, 2026

Project location map

39 Colonial Dr, Westford, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.