Published August 7, 2026 at 8:00 PM
Updated August 11, 2026
Site work and renovation of a civil project in King George, Virginia. Completed plans call for the renovation of a water / sewer project; and water / sewer project.
Retrofit and replace a failing septic system with a Low Pressure Force Main (LPFM) sewer system, including connection to the county public sewer force main, permitting, and complete turn-key construction. Onsite Septic System Abandonment and LPFM Installation Address: 9105 Kings Highway, King George, VA 22485 Inquiries :- Chip Boyles, Executive Director chip.boyles@gwregion.org Brianna Heath, Environmental Services Coordinator, brianna.heath@gwregion.org cc septicrelief@gwregion.org All work must be completed by October 9, 2026. Site Prep & Permits: Obtain all local utility, environmental, and building permits. Mark all existing underground utilities via Virginia 811. Grinder Pump Station: E-one Grinder Pump - semi-positive displacement or centrifugal type grinder pump station with two hardened stainless-steel cutters rotating at motor speed in precision relationship to hardened alloy shredding ring producing finely divided slurry. The minimum motor shall be 1 HP, 1725 RPM, high torque, capacitor-start, 240-volt, 60 Hertz, D-amp, single phase: with integral , automatic reset, thermal protector. Piping connections: Inlet into wet well four-inch (4") lateral; discharge force main 1 1/4" National Pipe Thread (NPT) depending on the type of use. Grinder pumps and control panels shall not be located inside buildings or dwellings. An electrical permit issued by the County is required. Electrical Connection : Install a dedicated outdoor electrical control panel . Wire the pump system to the main household electrical panel per local electrical codes. A disconnect shall be provided adjacent to the pump per NEC code. The pump controls will be located in the top housing of the core unit inside a waterproof access cover. They may also be located adjacent to the disconnect switch, in a NEMA 4 box. A transfer switch shall be provided so that the grinder pump can be powered by a generator during a prolonged power outage. All electrical equipment must be UL listed . All equipment must be tested in accordance with the NEC. Low Pressure Force Main Piping (LPFM) Excavation & Piping: Trench and install 10 linear feet of 4" PVC sewer line and 1 1/2" diameter X 363 linear feet (approximate) Low Pressure Force Main (LPFM) SCH . 80 PVC. The low pressure sewer main shall be marked by tracer wire in accordance with the County standards. Tie-In: Connect the property's gravity sewer line to the new grinder pump tank. Connect the pressure force main to the municipal sewer tap. A mechanical joint plug valve shall be provided at each change in pipe size. All low pressure mains and force mains shall be restrained. Restoration: Backfill all trenches, compact soil to prevent settling, rake, seed, and straw disturbed lawn areas. Repair any impacted driveway or walkway surfaces. Question Deadline 08/21/2026 Contact via email: septicrelief@gwregion.org . If any Bidder/Offeror has questions about the specifications or other solicitation documents, the prospective Bidder/ Offeror should contact the buyer whose name appears on the face of the solicitation no later than five (5) business days prior to the date set for the opening of bids or receipt of proposals.
GC Bidding
$500,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2026
September 28, 2026
9105 Kings Hwy, King George, VA
Related To This Project
King George, VA
Bid Date: Jul 28 2026
King George, VA
--
King George, VA
--
King George, VA
Bid Date: Jul 06 2026
King George, VA
Bid Date: Jun 16 2026
King George, VA
Bid Date: May 27 2026
King George, VA
Bid Date: Feb 10 2026
King George, VA
Bid Date: Jul 22 2026
King George, VA
--
King George, VA
--
King George, VA
--
King George, VA
--
King George, VA
--
King George, VA
Bid Date: Feb 04 2026
King George, VA
Bid Date: Jan 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.