Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2026 at 8:00 PM

Updated September 21, 2026

Site work for a golf course in Fort Washington, Maryland. Completed plans call for site work for a golf course.

Installation of irrigation systems for nine holes, a driving range, and a putting green. All inquiries regarding this solicitation are to be made in writing to: Cindy Martinez, Corporate Procurement Specialist Department of Finance, Corporate Procurement Services Email: Cindy.Martinez@mncppc.org The contractor shall be responsible for the installation of irrigation system of nine (9) holes , driving range and putting green at Henson Creek Golf Course. The work shall include furnishing of all supervision, labor, materials, tools and equipment necessary to perform and complete the installation of the project as shown on the drawings and any incidental work not shown or specified which can reasonably be determined to be part of the work and necessary to provide complete and functional system. The contractor shall be responsible for obtaining all permits, prior to the commence of of the irrigation installation , The work includes the following: a. an irrigation system for all 9 holes of the golf course plus practices areas; b. a new central control system, Rain Bird Cirrus Pro IC, ICM devices, and associated surge protection and wiring; c. sprinkler, quick couplers, valves, and associated pipe network; d . a submersible pump station including pumps , piping, valves, and electrical controls. Add Alternative 1 : WSSC Water Supply System. a. WSSC authorization. b. WSSC wet tap and 1.5" meter crock; c . 2' reduced pressure zone backflow preventer (RPZ), heat tape, remote control valve, insulated enclosure, concrete pad. d. 3" DR11 HDPE from RPZ to a PVC flow metering spool near the pump building; e. 10-2 w/G type UF from RPZ to the pump building; f. 12-1 type UF from pumping plant motor to control cabinet to the RPZ; g. 2" flow metering spool with connection to the pumping plant motor control cabinet; h. 2.5" PVC pipe from the flow metering spool to an open discharge at the irrigation pond. Question Deadline 09/03/2026 at 3:00 PM ET

Bid Results

$1,170,287.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
568
Active Projects
213
Bidding Soon
3,605
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2026

November 13, 2026

Project location map

1641 Tucker Rd, Fort Washington, MD

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed