BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2026 at 8:00 PM

Updated August 14, 2026

Site work and renovation of a multi-residential development in Bay City, Michigan. Completed plans call for the renovation of a multi-residential development.

Residential roof replacement. General Requirements - Federally Funded - Insurance Required - License Required Addresses: 201 W Jenny Street 801 State Street 1109 11th Street 213 S. Warner Street 310 N. Lincoln Street (this property includes the house and garage) Roof / Emergency Roof o o House to be completely re- roofed. This includes all roofs attached to the house unless otherwise stated. i.e. attached garage, entrance door overhangs or porticos, attached bump outs (micro additions), porch roofs, etc. Remove and replace any damaged decking boards exposed to weather in overhang before installing (covering with) new 7/16" OSB, matching as best as possible as this will be open / exposed. Install ice & water shield at all exposed eve locations, extending a minimum of 24" inside the exterior wall plane. Cover sheathing with 15# roofer's felt or approved synthetic membrane. Install dimensional shingles having a minimum 25-year manufacturer's warranty. Color selected by Homeowner from available stock samples. Any section of the roof with a pitch under 4 in 12 shall be roofed with a base of two layers of ice & water shield then shingled . Any roof with a pitch under 2 in 12 shall be roofed with black EPDM Membrane roofing. Provide venting sufficient to meet building code requirements without cutting into siding. Use a continuous ridge vent. In some cases, it may be acceptable to use box vents. Roof MUST have adequate venting for air intake and air exhaust. Roof MUST have adequate ventilation to preventdamage. Existing gable vents to be closed off either from the inside or on the outside with aluminum to match color of house if ridge vent is used. Some facia boards may need to be replaced ; give yourself an allowance to replace up to 15'. If more than 15' of facia board need to be replaced, you WILL need a contract change order. Wood fascia installed shall comply with M.R.C. 317 (Protection of wood & wood-based products). All replacement wood that will be left exposed CANNOT be pressure treated. It must be standard wood, primed and painted to comply with M.R.C. 317 (Protection of wood & wood-based products). Replace ALL existing flashing boots around vent pipes with new ones. At points where the roof intersects with vertical surfaces, flash with appropriate metal flashing AND counter flashing. If the intersection is on an angle, install step flashing and counter flashing. Thoroughly seal around any electrical mast or other roof penetrations. All materials shall be installed in conformance to manufacturer's instructions so as to not void the warranty. Provide dumpster or trailer on site for debris disposal and dispose of appropriately. Dumpster and/or trailer cannot be placed in the right-of-way (between sidewalk and street) or on the street without first getting a permit from engineering. Trim all tree branches that will interfere with the roofing that needs to be done. Thoroughly clean and remove all nails and other debris from yard. O.S.B Install new 7/16" OSB sheathing or 1/2" CDX over existing decking with the ends centered on rafters. To be nailed with 8d spiral or ring shank nails. The roof must have a continuous flat surface. Install aluminum wide flange drip edge at all edges of roof perimeter. All roofs are bid with complete OSB or plywood sheathing installed . If a roof already has OSB or plywood decking and does not need new sheathing, contact the project manager. A contract change order must be completed to remove the cost of the OSB/Plywood installation from the contract price. Contractor MUST call the project manager for sheathing inspection. Eavestrough Remove and discard existing eaves trough and dispose of. Install seamless new K5" gutters at all eaves. Include all downspouts, ells, extensions, hangers and other items required to complete this job. Do NOT install hangers over shingles. Gutters to hang plum and in position to catch the water as it comes off the roof. Straps and angle blocks must be used if fascia is not plumb. Do NOT allow water to drain onto any portion of the structure, including but not limited to other portions of the roof. Downspouts to drain away from house. If underground drain tile draining into house tile/drain system currently used terminate and seal tight to the weather. o Provide a splash block at each point of discharge at least 5ft away from house. Homeowner to select color from available stock samples. Question Deadline Aug 12, 2026 at 3:00 PM Any questions regarding this bid must be submitted in writing to the Purchasing Department via e-mail Susan Carmien, CPPB Purchasing Manager scarmien@baycitymi.gov (989)894-8115

Sub-Bidding

$470,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
109
Bidding Soon
1,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

September 18, 2026

Project location map

Multiple Locations, Bay City, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.