BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 12, 2026

Site work and new construction of a water / sewer project in El Campo, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of September 09, 2026 project was awarded to Longhorn Excavators awarded amount is $6,770,618.94. Channel widening along the Tres Palacios Channel from US BUS 59 (W Jackson St) to U.S. Highway 59 and the construction of a detention basin south of CR 406. The Project Site. The project is located along the Tres Palacios Channel from US BUS 59 (W Jackson St) to U.S. Highway 59 and south of CR 406 in the City of El Campo and Wharton County, Texas Bonds: 5% Bid Bond, Certified Check required. DESCRIPTION CUTTING AND PATCHING Execute cutting ( including excavating and backfilling), fitting or patching of the work required to: (1) Make several parts fit properly. (2) Uncover work to provide for installation of ill-timed work. (3) Remove and replace defective work. (4) Remove and replace work not conforming to requirements of the contract documents. (5) Remove samples of installed work as specified for testing. (6) Install specified work in existing construction. b. In addition to contract requirements, upon written instruction of the Engineer: (1) Uncover work to provide for observation of covered work. (2) Remove samples of installed materials for testing. (3) Remove work to provide for alteration of existing work. C. Do not endanger any work by cutting or altering the work or any part of it. d. Do not cut or alter the work of another Contractor without written consent by the Engineer. e. Prior to cutting which affects structural safety of the project, or the work of another Contractor, secure written approval by the Engineer. No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the City or engineer no less than seven (7) days prior to the bid opening. Each interpretation made will be in the form of an Addendum to the contract documents and will be distributed to all parties holding contract documents no less than seven (7) days prior to the bid opening. It is, however, the bidder's responsibility to make inquiry as to any addenda issued. All such addenda shall become part of the contract documents and all bidders shall be bound by such addenda, whether or not received by the bidders

Award

$6,770,619.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
160
Bidding Soon
3,034
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2026

October 23, 2026

Project location map

Multiple Locations, El Campo, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.