BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2026 at 8:00 PM

Updated August 17, 2026

Site work, renovation and addition to a municipal facility in Sheridan, Wyoming. Design plans call for the addition of a 1,200-square-foot municipal facility; and for the renovation of a municipal facility.

Design and construction of an approximately 1,200-square-foot building addition including site preparation, foundation, structural framing, roofing, siding, interior finishes, painting, mechanical, electrical, plumbing, overhead doors, and utility connections. Includes replacement of existing building siding and installation of spray foam insulation in both existing and new structures. Bonds: 100% Performance Bond, 100% Payment Bond.

Design

$570,000.00

Public - City

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
99
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

Project location map

2002 Frackleton Street, Sheridan, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.