BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2026 at 8:00 PM

Updated August 16, 2026

Site work and new construction of a fire / police facility in Laguna Woods, California. Completed plans call for the construction of a 8,579-square-foot, two-story above grade fire / police facility; and for site work for a fire / police facility.

Design-build services for Fire Station 12 Fire station for 4 person crew and 2 apparatus (KME Custom Pumper or similar). Station to accomodate 4 dorm rooms,kitchen and day room, gym and accessory functions. Station to house satellite Sheriff office and animal control office with kitchenette and restroom access. 5 Standard parking spaces and 1 van accessible parking space are provided. Online Q&A Yes Q&A Deadline 08/27/2026 5:00 PM (PDT) The Orange County Fire Authority (OCFA) seeks the design and construction of a new permanent fire station within the City of Laguna Woods through a Design/Build delivery method . The facility should serve as a modern , resilient, and communityfocused public safety facility designed to support emergency response operations, firefighter wellness, and long-term operational efficiency. The station shall accommodate : o One (1) frontline fire engine Support and utility response vehicles Four (4) on -duty personnel per shift 2 Offices Shared use functions with the Orange County Sheriff's Department and Animal Control Services The Design/Build Team shall provide complete architectural , engineering, permitting, construction, FF&E coordination, commissioning, and occupancy services required for a fully operational turnkey facility. 2. PROJECT GOALS o Provide a durable, low-maintenance fire station with a minimum 50-year service life Support rapid emergency response operations Incorporate firefighter cancer prevention and decontamination best practices Meet all applicable ADA and inclusive facilities requirements Provide resilient emergency backup systems Be compatible with surrounding neighborhood aesthetics Maximize operational efficiency and long-term maintainability Minimize lifecycle costs Allow for future technology and operational flexibility The initial estimate for the entire project is $17.8 million dollars split between two fiscal years. Question Deadline 08/27/2026 at 5:00 PM PT Any questions concerning this solicitation can be submitted online via the Q&A module available through online

GC Bidding

$17,800,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
701
Active Projects
283
Bidding Soon
4,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

January 18, 2027

Project location map

24121 Moulton Pkwy, Laguna Woods, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.