Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 24, 2026 at 8:00 PM
Updated August 29, 2026
Site work and renovation of an educational facility in Lamberton, Minnesota. Completed plans call for the renovation of a educational facility.
Agricultural field tile repair and new tile installation on University-managed land. Question Cuttoff Date & Time 8/19/2026 01:00:00 PM (ET) Scope of Work & Contractor Responsibilities The selected Contractor shall furnish all labor, materials, tools, heavy equipment, mobilization, and supervision necessary to complete the tiling installation as outlined in the provided field maps and estimated supply list. 2.1 Locating & Existing Tile Integration o o Exploratory & Field Mapping: Contractor must locate and map existing subsurface tile lines (including exact position, depth, pipe size, and overall condition). Integration/Repair: Existing tile lines must be preserved, repaired where necessary, and integrated seamlessly into the new installation layout. As-Built Documentation: Upon completion, Contractor must deliver an updated, accurate " as-built" tile map displaying all new and existing lines. 2.2 Installation Specifications o Tile Spacing & Sizing: Install new 4-inch subsurface plastic drain tile at 60-foot spacing. Material Requirements : Tile must be 4-inch single-wall , perforated plastic tile. County Main Connections: Connect new and integrated tile runs into the existing Redwood County main drainage tile infrastructure. Site Restoration: Backfill and level all plowed, trenched, or open-cut ditches immediately following installation.Materials & Field Layout References Field Maps: Attached as part of the RFP documentation. (See Exhibit 2 Field Tiling Maps) Pages 1 through 2: Paxton Township site and drainage layouts. O Page 3: Redwood Falls Township site and drainage layouts. Note: Maps delineate both proposed new tile runs and known existing tile. Estimated Quantities: Contractors must reference the attached Exhibit 3: Estimated Supply List included in the solicitation packet for preliminary linear footage and fitting counts. 4. Work Window & Site Access Constraints o Target Schedule: Work is scheduled to take place between late September and early November 2026, prior to ground freeze. Crop Harvest Coordination: Rye Fields: Harvested; cleared for access. Soybean Fields: Active crop present. Tiling in these specific spaces cannot commence until the soybean harvest is completed by the tenant. Access dates will be weather-dependent. Mobilization: All equipment transportation and mobilization fees must be included in the Responder's base cost proposal.
GC Bidding
$650,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2026
October 2, 2026
Multiple Locations, Lamberton, MN
Related To This Project
Lamberton, MN
Bid Date: Jun 23 2026
Lamberton, MN
Bid Date: May 21 2026
Lamberton, MN
Bid Date: Jan 23 2026
Lamberton, MN
Bid Date: Jul 17 2025
Lamberton, MN
Bid Date: Feb 19 2025
Lamberton, MN
Bid Date: Mar 07 2019
Lamberton, MN
Bid Date: Sep 15 2022
Maple Grove, MN
Bid Date: Sep 03 2026
Browerville, MN
Bid Date: Sep 02 2026
Owatonna, MN
--
Winona, MN
Bid Date: Sep 02 2026
Mora, MN
Bid Date: Sep 04 2026
Saint Paul, MN
Bid Date: Sep 09 2026
Saint Paul, MN
Bid Date: Sep 11 2026
Fridley, MN
Bid Date: Aug 27 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
