Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2026 at 8:00 PM

Updated September 20, 2026

Site work and new construction of a water / sewer project in Fort Gay, West Virginia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of approximately 1,050 LF of 6 inch waterline, 1,900 LF of 2 inch waterline, valves, 120 LF 4 inch steel casing, 80 LF 12 inch steel casing fire hydrant, water meter assemblies, air release valves, and connection to existing waterline. Bonds: 5% Bid Bond. Question Deadline 09/07/2026 Eric T. Hartwell, P.E., New River Engineers, Inc. (304) 342-7168 Questions may be submitted via email to eth@nreiwv.comQuestions received less than seven days prior to the date for opening of Bids Shall not be answered.

Post-Bid

$410,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
47
Bidding Soon
1,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2026

October 14, 2026

Project location map

3407 Wayne Street, Fort Gay, WV

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed