BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2026 at 8:00 PM

Updated August 19, 2026

Site work, paving and new construction of a mixed-use development in Leominster, Massachusetts. Completed plans call for the construction of a 105,000-square-foot, two-story above grade educational facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Fall Brook Elementary School Building Project, 25 Decicco Drive, Leominster, Ma 01453 - Invitation for Bids (Ifb) for Prequalified General Contractors and Filed Sub-bidders Only, Except for Elevators for Which Prequalification is Not Required. A. The Fall Brook Elementary School project consists of the construction of a new elementary school building, grades K-5, of approximately 105,000 s.f. and associated utilities, site and landscape work, and demolition of the existing structure. The school building is comprised of a front single story public structure, with main office, gym, cafeteria, nurse's suite, and custodial support spaces. The classroom bar is a two-story structure separate from the front section by a 2-hour firewall. The classroom building houses the classrooms, Special Education rooms and suites, Media Commons, and specialist rooms such as music, art and science. Both sections of the building are fully accessible and houses an elevator. The new building is primarily a steel structure, with glulam at select locations, and a brick, metal, high-performance windows exterior wall system, and both sloped metal and membrane roofing exterior. The building envelope and systems will meet the stretch energy code and the mass specialized opt-in code. The systems and exterior construction will be validated by a Cx agent. B. The exterior sitework includes new access roads and parking structures, sidewalks and pedestrian access, retaining walls, new play areas with structures, and landscaping including stormwater management systems. The new building will be constructed in close proximity to the existing building, which will be demolished after the new building is complete to allow construction of the new site features. The building site is adjacent to protected habitats and wetlands which will need to be separated from construction activities. Stormwater protection and erosion control is part of the scope of the work. C. The project is registered as a LEED project and will be attempting LEED Silver certification. Estimated Cost $85,398,438 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 08/27/2026 Bid questions can be submitted to the address listed above for submission of bids, or by e-mail to both: Craig DiCarlo, LeftField (OPM), Craig.DiCarlo@leftfieldpm.com Linda Liporto, LeftField (OPM), Linda.Liporto@Leftfieldpm.com

Sub-Bidding

$85,398,438.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
928
Active Projects
454
Bidding Soon
5,371
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

November 30, 2026

Project location map

25 Decicco Dr, Leominster, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.