BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 24, 2026

Site work for a water / sewer project in Fitchburg, Wisconsin. Completed plans call for site work for a water / sewer project.

Question Deadline 09/04/2026 All questions regarding the project shall be directed to Tyler Michlig, Project Engineer, Madison Metropolitan Sewerage District, tylermi@madsewer.org All questions about the meaning or intent of the Contract Documents shall be submitted to the District in writing not less than seven (7) days prior to the date for opening of Bids. Prequalification applications must be completed and submitted to the District office no later than 3:00 P.M. (local time), Tuesday, September 1 , 2026. Bidders will be notified only of disqualification no later than 3:00 P.M. , Friday, September 4, 2026. All work is located adjacent to USH 18/151 westerly of the crossing of Fitchrona Road. The Contractor shall provide all materials, labor, equipment, and services necessary to complete the Nine Springs Valley Interceptor Capacity Improvements Phase 2, for the Madison Metropolitan Sewerage District (OWNER). The Work includes, but is not limited to, the construction of approximately 3,414 lineal feet of sanitary interceptor. Sanitary interceptor sewer sizes include 15-inch, 36-inch, 54-inch, and 60-inch. The sanitary interceptor will include both precast and cast-in-place manholes and structures. The work includes two connections to the existing Pump Station 12. Dewatering is anticipated throughout the construction. The proposed sanitary interceptor will include approximately 80 feet of trenchless technology pipe installation for pipe beneath the Military Ridge State Trail. Manholes and existing interceptor will be both removed and abandoned throughout the corridor. Access is anticipated using matting along the edge of Goose Lake for the removal/abandonment of the existing interceptor and structures. Pavement replacement and associated items are included within the Pump Station site and for the Military Ridge State Trail entrance ramp. Tree removals are included along with wetland restoration and general site restoration.

GC Bidding

$4,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
140
Bidding Soon
2,362
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

November 10, 2026

Project location map

Multiple Locations, Fitchburg, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.