BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2026 at 8:00 PM

Updated August 25, 2026

Site work for a bridge / tunnel in Red Earth Creek, Alberta. Completed plans call for site work for a bridge / tunnel.

The Eastern Irrigation District is upgrading the Snake Lake Canal and as part of this work is seeking qualified Contractors to replace the existing crossing at Bridge File 72074 along Highway 1:16 approximately 21 km northwest of Brooks, Alberta. This project will involve the removal and disposal of an existing single 1982 mm diameter x 128 m x 128 m long concrete pipe, and the supply and installation of two (2) new 2400 mm (rise) x 3000 mm (span) x 128 m long Precast Concrete Box Culverts. The scope of work for this project includes, but is not limited to the following: - Mobilization - Site Occupancy & Lane Closure for Bridge Construction - Traffic Accommodation (Staged Construction) - Care of Water - Removal and Disposal of Existing Structure - Structural Excavation - Precast Concrete Box Culvert Installation (Owner Supplied Materials) - Granular Backfill - Non-Granular Backfill - Supply and Install Class 1 Heavy Rock Riprap - Roadway Work - Asphalt Concrete Pavement – Mix Type H2 (PG58-28) - Supply and Install Straw Rolls - Other Work

Post-Bid

$1,000,000.00

Public - State/Provincial

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
16
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2026

October 1, 2026

Project location map

SE 09-20-16 W4M, Red Earth Creek, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.