BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated September 2, 2026

Site work and renovation of a mixed-use development in Skokie, Illinois. Completed plans call for the renovation of a playground / park / athletic field; and playground / park / athletic field.

Installation of netting at Skokie Sports Park and the removal and installation of new playground equipment at Emerson Park. Bonds: 10% Bid Bond, Certified Check required. Question Deadline 08/24/2026 If the Bidder is in doubt as to the interpretation of any part of the Bid Documents, or finds errors, discrepancies or omissions from any part of the Contract Documents, they must submit a written request for interpretation thereof not later than three (3) days prior to opening of bids to the Park District Contract Awarded: September 16, 2026 Board Approval: September 15, 2026 General Pricing shall include ground protection, lifts and any necessary excavation equipment. Pricing shall include removal and disposal of any spoils and/or waste generated. All warranty information shall be included with bid submission regarding the netting and pole systems. Base Bid (green) o Four (4) 3-Section heavy duty steel poles spaced NTE 50' OC in front of existing 50' AGL system. o Pole locations TBD 20' Deep borings - 4,000 psi concrete Three (3) Horizontal rows 1 x 7 galvanized steel strand cable with vertical face cables Heavy duty end connectors, galvanized eyebolts and curved washer attachments o # 18 x 1" nylon netting (spec sheet below) or an equal to or greater than product, 1" Square 5% resin weather treated, rope bordered (minimum 1/4"), on the square golf netting secured to the cables utilizing spring loaded snaps, heavy duty twine and steel supports o (3) 55' High sections of netting finishing 45' AGL Alternate #1 (pink) o One (1) 24" OD/16" OD, 2-section heavy duty steel pole spaced NTE 50' OC in front of existing 20' AGL system. o Pole locations TBD 36" OD x 16' deep boring - 4,000 psi concrete o Two (2) Horizontal rows 1 x 7 galvanized steel strand cable with vertical face cables Heavy duty end connectors, galvanized eyebolts and curved washer attachments #18 x 1" nylon netting (spec sheet below) or an equal to or greater than product, 1" Square 5% resin weather treated, rope bordered (minimum 1/4"), on the square golf netting secured to the cables utilizing spring loaded snaps, heavy duty twine and steel supports Alternate #2 (blue) One (1) 24" OD/16" OD, 2-section heavy duty steel pole spaced NTE 50' OC in front of existing 20' AGL system. Pole locations TBD o 36" OD x 16' deep boring - 4,000 psi concrete o Two (2) Horizontal rows 1 x 7 galvanized steel strand cable with vertical face cables o Heavy duty end connectors, galvanized eyebolts and curved washer attachments # 18 x 1" nylon netting (spec sheet below) or an equal to or greater than product, 1" Square 5% resin weather treated, rope bordered (minimum 1/4"), on the square golf netting secured to the cables utilizing spring loaded snaps, heavy duty twine and steel supports

Post-Bid

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
575
Active Projects
273
Bidding Soon
3,931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

September 28, 2026

Project location map

3459 Oakton St, Skokie, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.